A look back at the operations carried out by Fouré Lagadec during the 2025 technical shutdown for Naphtachimie at the Lavera site.
During this operation, numerous actions were carried out, including dismantling, levelling, lifting, assembly, welding, cleaning, insulating and de-laminating.
Read the article arrow_forward